The college strives to provide the best possible information and technology infrastructure to its students, faculty and staff. This is in line with the college’s vision to impart learning in an innovative and future-oriented atmosphere. The college campus is Wi-Fi enabled and an e-resource web portal is available to support teaching practices.
The college had started out with a few Intel 8086/286 processors based on DOS environment without any LAN! In a span of years, successful institutional planning has resulted in tangible progress. The college boasts of a Computer Center equipped with servers, printers, desktops machines, laptops, LCD Projectors, and Scanners of the latest configurations.
Some of the key infrastructure features are listed below:
- The College has an above-par computer-student ratio of 1:2 (1207/3000). Every system is connected by network through LAN or Wi-Fi. Students and faculty members have been provided Wi-Fi authenticated user ID and password for internet access through their devices. The college possess valid license for all the software which the college requires for its laboratory and office usages.
- Information and Communication Technology enabled teaching is an important part of college our academic culture. Thirty class rooms have installed LCD projectors and teachers are encouraged to use these assets during their day-to-day teaching. Select topics from the syllabus are also taught with the help of Power-point presentations.
- The college library is also computerized. Three computer systems are installed for OPAC to provide easy and quick search options when seeking a specific volume.
- The Information Center is equipped with twenty-five computers having internet access provided by Delhi University. Nine systems are individually installed for the staff to access library services through computerized database. Two scanners are installed for scanning any documents and photographs for linkage with library members’ database. Network printers are installed to fulfil printing requirements for all computers installed in library.
Some other features:
- Out of the 1060 Laptops that the college possess 1030 have been provided to the students and 30 to the faculty members. On campus, the college makes available 192 Desktop Computers and 30 Laptops available in various departments.
- Every department is part of centralized LAN besides having their own departmental network.
- The college is part of NKN’s fiber optic Gigabit Network through University of Delhi with present internet speed of 40 Mbps scalable to Gbps.
- The college is also running automated operations. The college invites new ICT equipment for purchase in every financial year and then a proposal is sent to Government of NCT of Delhi for seeking grants and approval for purchase.
- From time to time, the college upgrades the common IT infrastructure facilities as well as ICT infrastructure in the department as per the need of curriculum.
- The college is planning to establish a multi-facility centre with funding from UGC.
- The college avails the National Knowledge Network Connectivity through the parent University. There are various services that are being availed using NKN backbone, namely:
- Delhi University Wide Area Network (WAN)
- College Local Area Network (LAN)
- Access to Scholarly Content of UGC
- Info net Digital Library Consortium
- Local Resources Sharing Services of Delhi University Library System
- Video Conferencing and Virtual class room activities through the University developed application called Virtual Learning Environment (VLE).
-
LAB INVENTORY
-
COMPUTER LAB 1 (ROOM NO-3)
SR.NO
INVENTORY NAME
NO OF UNITS/
QUANTITY
1.
Acer Veriton series M430 AMD Phenom 2.6 GHZ RAM, 320 GB Hard Drive, Wi-Fi Enabled, LCD Monitor, USB Keyboard & Mouse, DVD R/W Drive
07
2.
HCL EC2 Series Core 2 Duo Processor, 2 GB RAM, 320 GB HARD DISK, LCD 17””, PS/2 Keyboard & Mouse, DVD R/W drive
01
3.
HP Pro 3330 Series Core i3, 4GB RAM, 500 GB HD, Wi-Fi Enabled, 17”” LCD Monitor, PS/2 Keyboard & Mouse, DVD R/W drive
12
4.
Compaq Pressario Q Series, Core 2 Duo, 3 GB RAM, 320 GB HD, 17”” LCD Monitor, PS/2 Keyboard & Mouse, DVD R/W drive
01
5.
Compaq Pressario, Pentium D Processor, 2 GB RAM, 320 GB HD, , 17”” LCD Monitor, PS/2 Keyboard & Mouse, DVD R/W drive
01
6.
HP Compaq dx 2700 Series, Core 2 Duo, 2 GB RAM, 320 GB HD, , 17”” LCD Monitor, PS/2 Keyboard & Mouse, DVD R/W drive
01
7.
APC 3 KVA UPS
02
8.
VIEWSONIC PROJECTOR
01
9.
24-Port Bay stack Networking switch
01
10.
16-Port TP Networking Hub
01
11.
Voltas Window AC
01
12.
Ceiling Fan
02
13.
Teacher Table
01
14.
Chairs
38
15.
Tube lights
07
16.
CCTV Camera
01
17.
Iron Rack for Student’s Baggage
01
18.
SMF Battery 7AH
16
19.
Rack 4U
01
COMPUTER LAB 2 (ROOM NO-35)
|
SR.NO |
INVENTORY NAME |
NO OF UNITS/ QUANTITY |
|
1. |
HP Laptops |
39 |
|
2. |
HP LaserJet Printer 400 M401 |
01 |
|
3. |
VIEW SONIC PROJECTOR |
01 |
|
4. |
Eaton DX 10 KVA Online UPS |
01 |
|
5. |
24-Port D-Link Networking switch |
01 |
|
6. |
Ceiling Fan |
01 |
|
7. |
Teacher Table |
01 |
|
8. |
Chairs |
31 |
|
9. |
Tube lights |
04 |
|
10. |
LG Split AC |
01 |
|
11. |
LG Windows AC |
01 |
|
12. |
CCTV Camera |
01 |
|
13. |
Four Seater Bench |
04 |
|
14. |
SMF Battery 26AH |
16 |
|
15. |
Rack 4 U |
01 |
COMPUTER LAB 3 (ROOM NO-38)
|
SR.NO |
INVENTORY NAME |
NO OF UNITS/ QUANTITY |
|
1. |
HP Laptop |
35 |
|
2. |
Hitachi Projector |
01 |
|
3. |
24-Port D-Link Switch |
02 |
|
4. |
Tube lights |
04 |
|
5. |
Ceiling Fan |
04 |
|
6. |
Chairs |
38 |
|
7. |
Table |
1 |
|
8. |
Rack 2U |
1 |
COMPUTER LAB 4 (ROOM NO-206)
|
SR.NO |
INVENTORY NAME |
NO OF UNITS/ QUANTITY |
|
1. |
HP Laptop |
50 |
|
2. |
View Sonic Projector |
01 |
|
3. |
24-Port D-Link Switch |
02 |
|
4. |
Tube lights |
08 |
|
5. |
Ceiling Fan |
08 |
|
6. |
Chairs |
45 |
|
7. |
Table |
01 |
|
8. |
Rack 2U |
01 |
|
9.
|
HP LaserJet Printer 400 M401 | 01 |
COMPUTER LAB 5 (ROOM NO-205)
|
SR.NO |
INVENTORY NAME |
NO OF UNITS/ QUANTITY |
|
1. |
Acer Veriton series M430 AMD Phenom 2.6 GHZ RAM, 320 GB Hard Drive, Wi-Fi Enabled, LCD Monitor, USB Keyboard & Mouse, DVD R/W Drive |
29 |
|
2. |
HP Pro 3330 Series Core i3, 4GB RAM, 500 GB HD, Wi-Fi Enabled, 17”” LCD Monitor, PS/2 Keyboard & Mouse, DVD R/W drive |
13 |
|
3. |
Acer Intel Core i5 13400, 16 GB RAM, 1 TB Hard Disc, Windows 11 Pro |
03 |
|
4. |
HITACHI PROJECTOR |
01 |
|
5. |
Numeric 10 KVA Online UPS |
02 |
|
9. |
24-Port D-link Networking switch |
01 |
|
10. |
Ceiling Fan |
01 |
|
11 |
Tables |
01 |
|
12. |
Chairs |
45 |
|
13. |
Tube lights |
12 |
|
14. |
SMF Battery 42 AH |
16 |
|
15. |
Rack 2 U |
01 |
COMPUTER LAB 6 (ROOM NO-207)
|
SR.NO |
INVENTORY NAME |
NO OF UNITS/ QUANTITY |
|
1. |
Acer Intel Core i5 13400, 16 GB RAM, 1 TB Hard Disc, Windows 11 Pro |
47 |
|
4. |
Tube lights |
10 |
|
5. |
Ceiling Fan |
07 |
|
6. |
Chairs |
44 |
|
7. |
Table |
01 |
|
8. |
Rack 2 U |
01 |
|
9 |
Switches 24 Ports |
02 |
|
10 |
Switch 8 Port |
01 |
|
11 |
Elnova 10 KVA UPS |
01 |
|
12 |
SMF Battery 42 AH |
16 |
|
13 |
HP printer 208 dw |
01 |
SERVER ROOM
|
S.No |
INVENTORY NAME |
QUANTITY |
|
1. |
ACER AR 380 SERIES SERVER |
02 |
|
2. |
Baseline Networking 3 Com Hub 2928 plus SFP Plus |
01 |
|
3. |
Jupitor ACX1100-AC –12 port network Router |
01 |
|
4. |
ZYXEL MES-3728 networking Hub |
01 |
|
5. |
D-link Networking Hubs 24-port |
03 |
|
6. |
Ruckus Zone-Director 1000 |
01 |
|
7. |
Network DVR |
03 |
|
8. |
Rack 42 U |
01 |
|
9. |
Rack 4U |
01 |
|
10. |
Rack 2 U |
02 |
|
11. |
Acer Veriton series M430 AMD Phenom 2.6 GHZ RAM, 320 GB Hard Drive, Wi-Fi Enabled, LCD Monitor, USB Keyboard & Mouse, DVD R/W Drive |
03 |
|
12. |
Numeric HPX 1000 Online UPS |
01 |
|
13. |
Numeric HPX 200 Online UPS |
02 |
|
14. |
Battery 7AH |
16 |
|
15. |
Weather Proof Box |
02 |
|
16. |
Gigabit port switch |
01 |
|
17. |
Battery 4 AH |
01 |
|
18. |
Chairs |
04 |
|
19. |
Split AC Voltas |
02 |
|
20. |
Voltage Corrector |
01 |
|
21. |
Tubelights |
02 |
Wi-Fi Connectivity Devices
|
S.no |
Inventory Name |
Quantity |
|
1. |
Ruckus Aps- ZF 7962 |
24 |
|
2. |
Ruckus Outdoor Bridge |
03 |
Accounts Section
|
SR.NO |
INVENTORY NAME |
NO OF UNITS/ QUANTITY |
|
1. |
HP Pro 3330 Series Core i3, 4GB RAM, 500 GB HD, Wi-Fi Enabled, 17”” LCD Monitor, PS/2 Keyboard & Mouse, DVD R/W drive |
02 |
|
2. |
Acer Veriton series M430 AMD Phenom 2.6 GHZ RAM, 320 GB Hard Drive, Wi-Fi Enabled, LCD Monitor, USB Keyboard & Mouse, DVD R/W Drive |
01 |
|
3. |
HP Compaq dx 2700 Series, Core 2 Duo, 2 GB RAM, 320 GB HD, , 17”” LCD Monitor, PS/2 Keyboard & Mouse, DVD R/W drive |
01 |
|
4. |
Lenevo LCD 17” Monitor |
01 |
|
5. |
HP Printer LaserJet P1008 |
01 |
|
6. |
HP Printer LaserJet 1018 |
02 |
|
7. |
HP Printer LaserJet Pro 400 |
01 |
|
8. |
Microtek 1000 KVA UPS |
02 |
|
9. |
Dot-Matrix Epson 132 Col. Printer |
01 |
Administration Section
|
SR.NO |
INVENTORY NAME |
NO OF UNITS/ QUANTITY |
|
1. |
HP Pro 3330 Series Core i3, 4GB RAM, 500 GB HD, Wi-Fi Enabled, 17”” LCD Monitor, PS/2 Keyboard & Mouse, DVD R/W drive |
01 |
|
2. |
Acer Veriton series M430 AMD Phenom 2.6 GHZ RAM, 320 GB Hard Drive, Wi-Fi Enabled, LCD Monitor, USB Keyboard & Mouse, DVD R/W Drive |
02 |
|
3. |
HP Printer Leaser Jet Pro 400 |
01 |
|
4. |
HP Printer Laser Jet 1018 |
01 |
|
5. |
Microtek UPS |
01 |
|
6. |
24-Port D-link Networking Switch |
01 |
|
7. |
Dot- Matrix Epson 132 Col. Printer |
01 |
Networking Bridge
|
S.N.O |
Location |
Qty |
|
1. |
Library Roof Top |
1 |
|
2. |
Principal Residence Roof Top |
1 |
|
3. |
Staff Quarter Roof top |
1 |
POE SWITCH
|
S.N.O |
Location |
Qty |
|
1. |
Server Room (library) |
1 |
|
2. |
Comp Lab No.35 |
1 |
|
3. |
Comp Lab No.3 |
1 |
|
4. |
Room No. 11 Front |
1 |
|
5. |
BW Room 17 & N1 |
1 |
Projector
|
S.N.O |
Location |
Qty |
| 1. | Hall-1 | 1 |
| 2. | Hall-2 | 1 |
| 3. | 8 | 1 |
| 4. | 9 | 1 |
| 5. | 10 | 1 |
| 6. | 11 | 1 |
| 7. | Committee Room | 1 |
| 8. | 28 | 1 |
| 9. | 29 | 1 |
| 10. | 30 | 1 |
| 11. | 31 | 1 |
| 12. | 38 | 1 |
| 13. | N-2 | 1 |
| 14. | 41 | 1 |
| 15. | N-1 | 1 |
| 16. | 17 | 1 |
| 17. | 105 | 1 |
| 18. | 206 | 1 |
| 19. | 311 | 1 |
| 20. | N-3 | 1 |
| 21. | 46 | 1 |
| 22. | 50 | 1 |
| 23. | 51 | 1 |
| 24. | 52 | 1 |
| 25. | 53 | 1 |
| 26. | 56 | 1 |
| 27. | 57 | 1 |
| 28. | 61 | 1 |
| 29. | 62 | 1 |
| 30. | 63 | 1 |
| 31. | 02 (Resource Room) | 1 |
| 32. | 35 | 1 |
| 33. | 03 | 1 |
| 34. | AV Room | 1 |
| 35. | 108 | 1 |
| 36. | Foyer | 1 |
| 37. | 205 | 1 |
| 38. | 02 (Resource Room) | 1 |
| 39. | 27 | 1 |
| 40. | 302 | 1 |
| 41. | 304 | 1 |
| 42. | 307 | 1 |
| 43. | 26 | 1 |
| 44. | 109 | 1 |
| 45. | 208 | 1 |
| 46. | 209 | 1 |
| 47. | 308 | 1 |
| 48. | 309 | 1 |
| 49. | 408 | 1 |
| 50. | 409 | 1 |
CCTV
| S.No. | DVR 1 (Library Server Room) | |
| Camera No. | Location | |
| 1 | 1 | Computer Lab 35 |
| 2 | 2 | Canteen Far end from Counter |
| 3 | 3 | Canteen Near Counter |
| 4 | 4 | 2nd Floor Book Rack |
| 5 | 5 | Corridor facing Computer Lab 35 |
| 6 | 6 | 2nd Floor Issue return Counter |
| 7 | 7 | 2nd floor Reading Room |
| 8 | 8 | 2nd Floor College Building Near Room no. 61 |
| DVR 2 (Library Server Room) | ||
| 9 | 1 | Auditorium Back Side Right |
| 10 | 3 | Ground Floor Library Main Issue Return Counter |
| 11 | 4 | Foyer (New wire) |
| 12 | 5 | Library Entry (Rack) |
| 13 | 6 | 1st floor web access center |
| 14 | 7 | Auditorium Control room |
| 15 | 8 | Library Entry (Gate) |
| DVR 3 (Library Server Room) | ||
| 16 | 1 | Towards Auditorium |
| 17 | 2 | Over the Canteen Gate |
| 18 | 3 | College Front gate (Auditorium Side) |
| 19 | 4 | 2nd Floor Reading Room |
| 20 | 5 | Opposite canteen |
| 21 | 6 | Outside A.V. Room |
| 22 | 7 | Ground Floor Reading Room |
| 23 | 8 | 1st Floor Reading Room |
| DVR 4 (Administrative Officer Room) | ||
| 24 | 1 | Outside Principal Office |
| 25 | 2 | Near Statue |
| 26 | 3 | Corridor Between Room no. 22,23,24,25 |
| 27 | 5 | Resource Room 2 |
| 28 | 6 | Near Garden |
| 29 | 7 | Student Center |
| 30 | 8 | Hall 1 |
| DVR 5 (Administrative Officer Room) | ||
| 31 | 1 | Computer Lab - 3 |
| 32 | 2 | Near stairs leading to Staff Room College Front |
| 33 | 3 | Outside data resource Room |
| 34 | 4 | Committee Room |
| 35 | 5 | Committee Room |
| 36 | 6 | Corridor Between Room no.4,5,6,7 |
| 37 | 7 | Hall 2 |
| 38 | 8 | Outside Principal Residence |
| DVR 6 (New Building Computer Lab 206) | ||
| 39 | 1 | Computer lab 1st Floor Left Side |
| 40 | 2 | First Floor Lift Side |
| 41 | 3 | Second Floor Left Side |
| 42 | 4 | Second floor Lift Side |
| 43 | 5 | ground Floor Right Side |
| 44 | 6 | Third Floor Lift Side |
| 45 | 7 | Exit main Gate Ground Floor |
| 46 | 8 | First Floor Right Side |
| 47 | 9 | Main entry Ground floor |
| 48 | 10 | Third Floor Right Side |
| 49 | 11 | Second Floor Right Side |
| 50 | 12 | Ground Floor Left Side |
| 51 | 13 | Third Floor Left Side |
| S. No. | Camera No. | DVR 7 (Library Server Room) |
| 52 | 1 | Auditorium Front View (From Right) |
| 53 | 2 | Computer Lab 38 |
| 54 | 3 | Auditorium Backside (Left) |
| 55 | 4 | Auditorium Left Side |
| 56 | 5 | Auditorium Front View (From Left) |
| 57 | 6 | Auditorium Front Right |
| S. No. | Camera No. | NVR 8 (Administrative Officer Room ) |
| 58 | 1 | Admin (Back) |
| 59 | 2 | Account Deptt (Back side) |
| 60 | 3 | Account Deptt (Near Cashier) |
| 61 | 4 | Outside Resource Room |
| 62 | 5 | Admin Office |
| 63 | 6 | College Main Gate (Entrance) |
| 64 | 7 | Out Side Main Gate |


